Werribee · 3030

Bathroom renovations Werribee

An awkward shower, not enough storage or a layout that wastes space? Whether you want to refresh the room or remodel the layout, tell us what you want to change and we’ll be in touch about your request.

Request a quote Explore services

Bathroom Renovations · Homes & properties

A bathroom with timber vanity, shower and terrazzo-style floor

Bathroom renovation plans

A bathroom that fits your day

A good bathroom starts with how you use it. Think about the morning rush, storage for everyday items and enough room to move around the fittings.

Keeping plumbing in place and changing the layout involve different work. Set out the changes you want, then ask for a scope that covers preparation, waterproofing, fittings and finishes.

Our services

Bathroom Renovations services

Bathroom renovation costs and planning

What is a realistic budget for a bathroom renovation?

It depends on the scope. A complete renovation, where the room is stripped out, waterproofed, retiled and refitted, costs more than a cosmetic update, and layout changes and premium finishes push it higher again.

The size of the room, whether fixtures move, the condition of the floor and walls under the old tiles, and the fittings you choose all change the price. Ask each quote to show these separately.

Working to a tight budget? See what a small bathroom budget can cover.

Bathroom renovation costs and planning

What is the most expensive part of redoing a bathroom?

Usually the labour and building materials, not the fittings.

That means the scope sets most of the price. Moving the toilet or shower waste, shifting a wall or replacing a damaged floor adds trade work. Cheaper tapware or tiles help, but they change a smaller share of the total.

Bathroom renovation costs and planning

Renovating vs remodelling: when the layout changes

A renovation usually keeps the toilet, shower and vanity where they are and replaces what’s there. A remodel changes the layout, for example moving the toilet or shower waste, relocating a wall or swapping a bath for a walk-in shower.

Layout changes bring in more plumbing and building work, so ask for each quote to show the layout work separately from the finishes. If the room needs a building permit, the contract should say who gets it (BPC).

Bathroom renovation costs and planning

What are common bathroom renovation mistakes?

Starting before the plans and selections are finished, signing a contract that leaves fittings unpriced, and not checking who is registered or licensed to do the work. The Building and Plumbing Commission warns that gaps like these can cost you more later.

  • Starting work before the plans and designs are finished. The BPC calls this risky.
  • Leaving taps, tiles and other fittings as prime cost items with no make, model or price.
  • Not getting it in writing. Above a set contract value, the work needs a written major domestic building contract with a registered builder.
  • Skipping the plumbing paperwork. Plumbing work above a set value needs a compliance certificate from a licensed plumber.
  • Treating waterproofing as a detail. The shower floor must be waterproofed, and for a shower without a screen that zone runs 1500mm out from the shower rose (BPC: waterproofing of wet areas).

Victorian rules

Rules that protect you in Victoria

These come from the Building and Plumbing Commission (BPC), the Victorian regulator for builders and plumbers. They apply whoever does the work.

  • Above a set contract value, you need a written major domestic building contract with a registered builder. BPC: agreements and contracts
  • Check the builder’s registration yourself on the BPC’s Find and check a practitioner search.
  • Deposits are capped at a percentage of the contract price, and the cap is lower for larger contracts. BPC: agreements and contracts
  • Plumbing work above a set value needs a compliance certificate from a licensed plumber, issued within five days of finishing. BPC: compliance certificates
  • The contract should list what’s included and excluded, the prime cost items (taps, tiles and other fittings not yet priced) and who gets any permits.

Checked against the BPC website on 18 October 2026.

Before work starts

Request a quote for the work

Identify essential changes, then list finishes and fittings still to be selected. Ask how undecided items are allowed for in the quote.

Check removal, trade work, fixtures and finishing together. Clarify who coordinates the work and how variations are handled.

Common projects

What needs attention?

Useful answers

Frequently asked questions

Should I keep the existing layout?

Ask the renovator to compare the work involved in keeping it and changing it.

Can the quote be final before all selections are made?

Ask how allowances and later selections are documented. Identify which decisions affect the price.

What should I include in my quote request?

Include your suburb, a description of the work and any useful photos or existing reports. Note access restrictions and the timing you have in mind.

What should I decide before asking for a quote?

List the fittings you want to keep, the layout changes you are considering and the finishes you prefer. Ask which selections can be made later.

Your property · Werribee

Tell us what you need.

Tell us about the work at your property. Leave a phone number or email so we can follow up.

  1. Tell us what you need

    A few details about the job and its location.

  2. Discuss your options

    We’ll be in touch about your request.

  3. You decide

    Agree the scope and price before any work starts. An enquiry is not a booking.

Still working out the details? A brief description is enough to start.

Request a quote

Bathroom Renovations in Werribee

Your quote request

Add a phone number or email. You can leave both if you prefer.